VIDEO
500M XXL Mono piles Vibrated
2017-11-10    by : admin


This video was shot at a pilot study in Germany. The soil conditions are identical to those found in the North Sea. The pilot project’s objective is to demonstrate that the lateral load capacity of vibrated and hammered piles in sand is proven to be equivalent. Furthermore, it aimed to indicate that full depth vibro-driving of monopiles (in comparison to hammered piles) has lower noise levels, causes lower fatigue and stress to the monopiles, is faster, and more cost effective. Note the amazing driving speed of the 500M! Six 21 meters long monopiles with a 4.3 meters diameter, weighing in at 93t each, driven within 3 minutes.

Questions that
need to be answered?
I would be happy to answer them personally to you
Frank Zhang
Senior Sales Manager
Ask your question
021-34688990
  • Shanghai ICE Construction Machinery
  • Phone: (86) 21 3468 8990
  • Fax:  (86) 21 3468 8901
  • Email: contact@icevibro.com
  • Website: www.icevibro.com
  • Address: 6999 ChuanSha Road,
  •      PuDong District,No.B8,
  •      201202 Shanghai,China

沪公网安备 31011502008669号


沪ICP备19006476号